RETAILGALLERYJEWELLERYHOSPITALITY
PHOTOMETRICSLIGHT PLAN GUIDEEN / DE / ES
DEMORequest a quote

SHOWROOM LIGHTING / LAYOUT DEMO 02

Light the object, not the room

Track, recessed and linear fixtures specified around what the visitor should notice first — beam angle, colour rendering and glare control come after that.

RETAILGALLERYJEWELLERYHOSPITALITY
CRI 90 / 97Colour rendering
12°–60°Beam choices
2700–5000 KCCT range
SPECIFICATION ORDERThree questions first

What is on display, how high is the ceiling, and how much daylight is in the room.

01CRI 90 / 97High-CRI option
0212°–60°Swappable optics
03UGR < 19Low-glare recessed
04DALI / 0-10VDimming options
053-step SDCMBatch colour consistency
06On-site mock-upOne lit bay first

FIXTURE FAMILIES

Four ways to shape a beam

Four fixture families, each with its own optic, mounting method and control interface. The beam shape is the fastest way to narrow a specification.

HOW TO READ THIS

Beam angle follows the object size; CRI follows the surface colour; control follows how often the room layout changes.

0112° – 60°

Track Systems

Adjustable heads on 1-circuit and 3-circuit track, with swappable reflectors for changing floor plans.

SWAPPABLE OPTIC1 / 3 CIRCUIT
View family
02UGR < 19

Downlights

Recessed, fixed and adjustable with deep-set optics for low-glare ambient layers.

RECESSEDLOW GLARE
View family
032700–5000 K

Linear Profiles

Continuous runs for shelves, coves and display cases, with diffusers chosen for the viewing angle.

CONTINUOUSDIFFUSER OPTIONS
View family
04DALI / 0-10V

Controls

Drivers and scene control for multi-zone showrooms where displays change by season.

SCENE-READYMULTI-ZONE
View family

INSIDE THE OPTIC

A beam is built, not ordered

What is worth checking before a light plan is signed off: which reflector is fitted, where the LED sits, how heat leaves the housing and how the beam is cut off.

WHY IT MATTERS

Optics decide the lit area on the object. Change them after installation and the whole aim schedule has to be redone.

FOUR THINGS TO SPECIFY
  • 01
    Reflector & lens

    Beam angle, field angle and the cut-off that keeps light off the surrounding wall.

  • 02
    LED & CCT

    CRI 90 or 97, 2700–5000 K and colour consistency recorded per batch.

  • 03
    Thermal path

    Heatsink sizing for enclosed ceilings and insulated recessed installs.

  • 04
    Glare control

    Deep-set optics, baffles and UGR targets for the viewing direction.

CRI 90 / 97Rendering options
3-stepSDCM, typical
UGR < 19Low-glare optics
Per batchCCT records

WHERE IT GOES

Four rooms, four different jobs

Beam angle, colour rendering and control change with what is on display. These four spaces cover the constraints that come up in a first enquiry.

CONSTRAINT MAP

Each room changes one dominant requirement. Find that first and the rest of the light plan follows.

01

Retail & Boutique

Accent lighting for fashion and accessories, with track positions that move as the floor plan changes.

CHANGING FLOOR PLAN
02

Gallery & Museum

Tight beam control, high colour rendering and UV-aware choices for sensitive works.

TIGHT BEAM / UV-AWARE
03

Jewellery & Watches

High-intensity accent and sparkle without washing out the display case or the metal finish.

HIGH INTENSITY / SPARKLE
04

Hospitality

Layered ambient and task light that stays comfortable over a long sitting.

LAYERED / LONG STAY

FIXTURE COMPARISON

Four families, one beam logic

Read across a row to see what changes between fixture families. These are layout ranges for comparison, not a substitute for a photometric file.

READ THIS FIRST

Start with the object size, then the ceiling height, then how often the room is re-merchandised.

PARAMETERTrackDownlightLinearControls
Beam angle12°–60°24°–60°DiffusedBy zone
Colour renderingCRI 90 / 97CRI 90CRI 90 / 97By driver
CCT2700–5000 K2700–4000 K2700–5000 KBy scene
Control1 / 3 circuit0-10V / DALI0-10V / DALIDALI / 0-10V
MountingSurface trackRecessedCove / shelfCabinet
GlareBaffle optionUGR < 19DiffuserBy scene

TYPICAL RANGES

The numbers behind a beam

Indicative ranges across the fixture families. A real specification starts with the room, not the wattage.

RANGES, NOT PROMISES

Every range here narrows once the object, the ceiling height and the daylight in the room are known.

01Colour renderingCRI 90 / 97Optional high-CRI variants
02Beam angle12° – 60°Swappable reflectors
03CCT2700 – 5000 KWarm to neutral white
04ControlDALI / 0-10VScene-ready drivers

LIGHTING CONTEXT

What the beam is asked to do

Application references shown as illustrative photography. Each frame isolates a different constraint on the specification.

APPLICATION REFERENCES

These are illustrative application images, not photographs of completed projects.

Boutique floorMOVABLE TRACK / ACCENT
Gallery wallTIGHT BEAM / HIGH CRI
Jewellery caseSPARKLE / GLARE CONTROL
Hotel loungeLAYERED / DIMMABLE

OPTICS & ASSEMBLY

Where the light is actually shaped

Four stages that change how a beam lands. Useful on a first visit, before anyone asks for a photometric report.

TRACEABLE BY BATCH

CCT and output records are kept against production batches, so a later replacement can be matched.

  • 01
    Optic selection

    Reflector and lens choices matched to beam angle and cut-off.

  • 02
    Photometric check

    Beam distribution and glare measured per fixture family.

  • 03
    Thermal design

    Heatsink sizing for enclosed and recessed installations.

  • 04
    Batch consistency

    CCT and output checked across a production run, recorded by batch.

TEST PATTERNS
BEAM DISTRIBUTIONGLARE / UGRCCT CONSISTENCYBURN-IN

WHAT SHIPS WITH IT

The file an installer works from

A lighting layout is a set of documents as much as a set of fixtures. This is the delivery file an installation team actually uses.

DELIVERY FILE

Ask for these four documents before the fixtures leave; they are what make a later re-aim straightforward.

01

Photometric file

IES data per optic, so the lux estimate can be checked against the plan.

02

Aim point schedule

Fixture positions, tilt angles and target points on one sheet.

03

Scene settings

Zone grouping, dimming curves and the DALI or 0-10V address list.

04

Spare optics list

Reflectors, diffusers and drivers with quantities for the build.

PROJECT PATH

From a floor plan to a switched-on room

Four steps, each with something the client can look at and sign off before the next one starts.

VISIBLE OUTPUTS

Every step ends with a drawing, a sample or a setting sheet, not a status update.

01

Survey

Ceiling height, display positions, finishes and daylight recorded on the plan.

OUTPUTMarked-up floor planKICK-OFF
02

Light plan

Fixture layout, beam angles, control zones and a lux estimate.

OUTPUTDrawing + lux estimateBEFORE ORDER
03

Mock-up

One bay lit on site to check the beam, the CRI and the glare in person.

OUTPUTApproved sample baySIGN-OFF
04

Handover

Aim points, scene settings, photometric files and a maintenance sheet.

OUTPUTDelivery fileHANDOVER

BEFORE YOU ASK

The questions that shape a light plan

Short answers to the six things that usually decide a fixture specification. The full answers live in the layout guide.

STILL UNSURE?

A beam angle worksheet is usually faster than a long email thread.

How do I choose a beam angle?

Work backwards from the object size and the throw distance. A small object far away needs a narrow beam.

Is CRI 97 worth specifying?

It matters where surface colour is the product — artwork, fabric, jewellery. For circulation areas CRI 90 is usually enough.

DALI or 0-10V?

DALI suits rooms with changing zones and scenes; 0-10V is simpler where one dimming group is enough.

How is glare controlled?

Deep-set optics, baffles and a UGR target checked against the actual viewing direction, not just the datasheet.

Will colour match across a run?

CCT and output are checked per batch against a 3-step SDCM target and recorded before packing.

What do you need for a mock-up?

One representative bay, the finish samples and the object that will be lit. A photo of the space is enough to start.

DOCUMENTS

Take the light plan away

Three sample documents a buyer usually asks for before a layout discussion. Shown here as layout placeholders.

SAMPLE DOCUMENTS

These are placeholders in a demo layout, not downloadable files.

DATASHEET

Fixture photometrics

Beam angle, CRI, CCT and driver ranges collected in one table.

View sample
GUIDE

Beam angle worksheet

A short worksheet for turning object size and throw distance into an optic.

View sample
CHECKLIST

Mock-up checklist

Ceiling, finishes, daylight and control zones to confirm before sign-off.

View sample

PLAN A ROOM

Send a floor plan, get a light plan

Ceiling height, shelf positions and the objects on display are enough to start a beam layout.

Request a light plan

This is a layout demo. No enquiry is actually sent.

WHAT TO SEND

Four things are enough

  • Floor plan with ceiling height
  • What is on display and where
  • Wall and floor finishes
  • Daylight and existing circuits